top of page

Black Dog Long Lead.

5 Metres Long with snaphook and handle.

The ideal tool for training dogs and puppies for Recall,or allowing dogs to roam in the park, or the beach, while still maintaining lead control.

An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead.

Long Lead is made from 20mm wide webbing.

Long Lead - 5 metres

$35.00Price
    bottom of page